Interceptor Utility (SUV)

Ford

8076 is currently the "most appropriate" code for the police SUV, as it is the only SUV code, and is slighly higher than police cruiser (8073) hourly rate.


Manufacturer

Ford

Model

Interceptor Utility (SUV)

Date Added

08/20/2020

Associated Cost Codes

8072
No longer in the FEMA schedule (last listed: 2023)
81% of records use this code

Automobile, Police

HP to 250
Notes Patrolling.
FEMA Rates
Jul 26, 2023:
Sep 15, 2021:
Aug 15, 2019:
Sep 1, 2017:
Jul 1, 2015:
Mar 8, 2013:
Sep 15, 2010:
May 1, 2008:
Aug 28, 2005:
$0.68/mile
$0.56/mile
$0.55/mile
$0.54/mile
$0.65/mile
$0.60/mile
$0.60/mile
$0.63/mile
$0.55/mile
8076
Code redefined in 2025
11% of records use this code

Automobile, SUV Mid Size

EcoBoost 2.3L I-4 gasoline direct injection, DOHC, variable valv
FEMA Rates
Jul 1, 2025:
Jul 26, 2023:
Sep 15, 2021:
Aug 15, 2019:
Sep 1, 2017:
Jul 1, 2015:
$16.10/hour
$42.27/mile
$20.77/hour
$23.99/hour
$22.00/hour
$21.50/hour
8073
9% of records use this code

Automobile, Police

HP to 250
Enigne: 3.6L V6 or 5.7L V8 HEMI Transmission: 8 Speed
Notes Stationary with engine running.
FEMA Rates
Jul 1, 2025:
Jul 26, 2023:
Sep 15, 2021:
Aug 15, 2019:
Sep 1, 2017:
Jul 1, 2015:
Mar 8, 2013:
Sep 15, 2010:
May 1, 2008:
Aug 28, 2005:
$19.14/hour
$19.89/hour
$16.27/hour
$16.05/hour
$15.69/hour
$19.75/hour
$16.25/hour
$16.25/hour
$18.00/hour
$14.35/hour

data last refreshed on 10/23/2026 18:24:04

External Links


Did you know?

Equipment models may match more than one code due to:

Variances within equipment. Trim specs, different engines, or attachments may change the cost code.

Varying interpretation of codes among FEMA personnel, or errors among past disaster grant information.

This lookup tool references “approved” equipment codes from within the www.erassist.com equipment module as well as city/county equipment lists (with codes) for federal disaster grants throughout the US.


Disclaimer

This is not a FEMA website. Only FEMA may determine reimbursement eligibility, which includes final determination regarding cost code applicability to specific equipment. This public site should be used as a resource, but is not a cost code certification site. Should FEMA disagree with a cost code identified/recommended on this site, please provide information to us at costcode@erassist.com so that we can identify the conflicting interpretation or consult with FEMA for clarification and update our recommendation accordingly.