Cost Code 8153

8153

Broom, Pavement, Mounted

HP to 18
Broom Length 72 Inches
Notes Add Prime Mover cost for total rate
FEMA Rates
2019:
2017:
2015:
2013:
2010:
2010:
2008:
2005:
$6.24/hr
$6.20/hr
$6.50/hr
$6.00/hr
$6.00/hr
$6.00/hr
$6.50/hr
$6.10/hr

Equipment makes/models typically coded to this code


data last refreshed on 07/30/2021 06:12:52

External Links