Cost Code 8150

8150

Broom, Pavement

HP to 35
Broom Length up to 72 Inches
FEMA Rates
2023:
2021:
2017:
2015:
2013:
2010:
2010:
2008:
2005:
$69.04/hr
$24.08/hr
$24.50/hr
$14.50/hr
$12.30/hr
$12.30/hr
$12.30/hr
$14.00/hr
$9.35/hr

Equipment makes/models typically coded to this code


data last refreshed on 11/21/2024 11:39:18

External Links