Cost Code 8050

8050

Arrow Board (Sign)

HP .1 to 8
Notes Trailer Mounted.
FEMA Rates
2019:
2017:
2015:
2013:
2010:
2010:
2008:
2005:
$4.53/hr
$4.43/hr
$3.50/hr
$3.15/hr
$3.15/hr
$3.15/hr
$3.40/hr
$3.10/hr

Associated Equipment

Equipment models that have been assigned this cost code in ER Assist software equipment module.
data last refreshed on 10/20/2019 14:10:01

External Links